![Flemish bond](https://billemory.com/blog/wp-content/uploads/2024/01/240117bw-10sq-ft-Jno-Baltimore-brick.jpg)
John’s wall
![Flemish bond](https://billemory.com/blog/wp-content/uploads/2024/01/240117bw-10sq-ft-Jno-Baltimore-brick.jpg)
photography from the Chesapeake Bay watershed by Bill Emory
The low bid for installing the deluxe bathroom came in somewhere above six hundred thousand dollars ($600,000).
World class city, assembly of geniuses. I am glad the City is holding back. The project was cancelled.
We have CATEC, we have UVA, we have thousands of hipsters. We can build a bathroom. Get people involved that know how to work with their hands. Dig a foundation, build with all the ash being cut down in the park. Make a composting unit or a vault system, using drinking water to transport human waste is insane.