temporary infrastructure


Lineman from Davis H Elliot Electrical Contractors works to untangle a 20,000 volt distribution line on Park Street.
We had a thunderstorm in Charlottesville Sunday. Some trees dropped limbs, others snapped.

Invariably, after storm events there are calls for sapletting…

Lets go axe some trees, they made me miss America’s Funniest Home Videos

How do they do it in the big leagues? Like New York City? Where are their wires?
In Charlottesville, I’d be surprised if we spent more than a hundred thousand dollars last year putting this infrastructure underground, less than we’d spend sending a half dozen children to school.
(below- quercus alba v. Buick, Park Street north of its intersection with Cutler Lane.)

tree v car
May 3, 1990, the Charlottesville City Council and the Planning Commission met and discussed undergrounding electric wires, a lengthy excerpt from the minutes follows.

The undergrounding of utilities was discussed.
Ms. Waters stated that Council’s position was to underground utilities where possible but did not support a major undergrounding effort because of the high cost.
Mr. Akin stated that at his request students in the Systems Engineering Department at the University will conduct a complete study on the management of utilities, including undergrounding and the potential for City ownership. Mr. Akin stated that his intent was to determine how the City can more effectively have control over the utilities.
Mr. Sours noted concern with possible bias of the study and recommended that the study be coordinated through the City Manager’s office.
Ms. Waters stated that there had been no collective decision on the part of the Planning Commission or Council to study utilities and expressed concern about devoting staff time to a study commissioned by one individual.
Mr. Toscano stated that he thought it was positive that the University was willing to take the study on.
Rev. Edwards stated that he would be interested in seeing what the study showed.
Ms. Kay Slaughter, Council Member elect, questioned whether the City had a policy about undergrounding for new projects and Mr Gary O’Connell, City Manager replied that undergrounding has been required for new construction.
Ms. Sue Lewis, Planning Commission member, stated that she felt the City should use the students at the University as resources more often.
Mr. O’Connell stated that he and the City Attorney have been working with Virginia Power on the undergrounding issue.


Park Street was closed north and south of the Route 250 bypass Monday morning.

Author: WmX

I stumbled off the track to success in 1968, started chasing shadows that summer. Since then, In addition to farm-laborer and newspaper photographer my occupational incarnations include dishwasher, janitor, retail photo clerk, plumber, HVAC repairman, auto mechanic, CAT scan technologist, computer worker and politico (whatever it takes to buy a camera.) I am on the road to understanding black and white photography.

2 thoughts on “temporary infrastructure”

  1. what did Mr. O’Connell, the “City Manager” find out from Virginia Power?

  2. “Mr. O’Connell stated that he and the City Attorney have been working with Virginia Power on the under-grounding issue.”

    Maybe they figured a way to put a nuki-ler power plant under the City? That Mr. O’Connell has a big brain-piece.

Comments are closed.