Collateral damage

sign by Max Frazee
This afternoon the RWSA Board of Directors will continue to address the issue of sanitary sewer overflows (SSO’s) occurring in their transmission system secondary to failed infrastructure (leaky pipes) that are part of the collection system.
Fixing the pipes is the expensive option, 400 million to 2 billion dollars.
Building a new sewage pumping plant is the quick fix for SSO’s and comparatively inexpensive (labor and materials cost 25-37 million dollars).
The concern of central Virginians is the collateral damage, the loss of value to our region. Pumping plant plan pricetags discussed to date do not reflect collateral damage costs, damage to the social, economic and cultural fabric at the foot of Monticello Mountain, impacts to a city park, the primary gateway to the Rivanna River, impacts to a national historic district and impacts to a neighborhood.
The overall cost of the project, to date, has not reflected the cost of locating the pumping station in “the wrong place”.
The cost of building a new 53 million gallon per day pumping plant must include the costs to mitigate its calamitous side effects, costs not reflected in the “materials and labor” estimate.

Author: WmX

I stumbled off the track to success in 1968, started chasing shadows that summer. Since then, In addition to farm-laborer and newspaper photographer my occupational incarnations include dishwasher, janitor, retail photo clerk, plumber, HVAC repairman, auto mechanic, CAT scan technologist, computer worker and politico (whatever it takes to buy a camera.) I am on the road to understanding black and white photography.