Monticello, Saunders Trail, VDOT, Route 20 South

Saunders trail
Walked to Monticello this morning on the Saunders trail. Lots of pedestrians out. Encountered 114 people on the way up the mountain, 130 on the way down.


Saunders trail lot
People enjoy walking in a place where cars are disciplined and there is canopy overhead. The great paradox is that to find such a place they have to drive to it. The Saunder’s Trail Parking lot was packed.


bike hell
Long range City and County plans envision a bike ped connection to the Saunder’s trailhead. Meanwhile, from Charlottesville one must walk or bike 4000+ feet on the VDOT Route 20 South straightaway. A road that is a killing field for cyclists and walkers. There are no provisions for users other than motorists. The vehicles are in max velocity mode. Taching up for I-64, or in a post interstate frame of mind, four lane divided highway, high speed merges, go go go!

3/7

0.42857142857? 3:7? Marvel not that I said unto thee, Ye must be born again.
0.42857142857? 3:7? Marvel not that I said unto thee, Ye must be born again. There is the symbol, not sure of the intended meaning.

A million cubic feet

CAT 740B
Work was paused temporarily Monday at RWSA’s excavation for members of the public to visit the site, the location of the future Rivanna pumping station.


nobody looks good in a hardhat
First up. Schooling from Dr. Richard Gullick on this great project, using gravity to transport waste water to the sewage plant instead of building a massive pump station adjacent to residences, a state scenic river and a park. The influent to the new pumping station will flow through a pipe in a tunnel bored through 1600 feet of bedrock.


big hole
Attendees at the edge of the excavation.


release the Kraken!
The tunnel boring machine, the mechanical star in our community drama of doing the best, not the cheapest, thing. Enduring thanks to the public and the RWSA Board for this outcome.

Franklin Street, ongoing

2005 WMNA President Allison Ewing
Ten years ago in May we marked up maps of the Woolen Mills talking about safety and quality of life as it relates to the City right of way in our neighborhood. There have been many entries in this discussion.
There was a moment of hope a year ago 6/16/2014:

Ms. Szakos moved to approve a six month pilot from Market St. to the driveway of the existing business with appropriate signage, conduct a traffic study, and engage citizens and businesses. Ms. Galvin seconded, with the addition of a clearly marked pedestrian pathway. Ms. Smith said we should be sure we give adequate notice to the neighborhoods. The resolution passed. (Ayes: Ms. Szakos, Ms. Smith, Mr. Huja, Mr. Fenwick, Ms. Galvin; Noes: None.)

Never happened.
Since that time the Bike-Ped master plan revision has been recommended for approval by the Planning Commission. County and City meet to discuss the Rivanna corridor and planning issues along their joint boundary.
Last night as part of its consent agenda Council approved funds for a sidewalk on Franklin.
The Code audit, Standards and Design Manual revisions, the Streets That Work initiative, these hopeful initiatives seem to be MIA.
The new director of Neighborhood Development has a very full plate.